
DETAILS
This bathroom was one of three bathrooms renovated in this 3 family dwelling in Arlington. The main consideration in this bathroom was to improve the existing heating which was initially installed at the bottom interior part of the vanity. After the complete demolition of the bathroom additional plumbing work was done to reroute the pipes from the existing location to the opposite wall. Custom framing was done to install the new radiator inside the wall. The end result increased heat in the bathroom and made it more efficient.